Project was to renovation the existing HVAC systems at the Columbia Airport. MECA provided the HVAC and construction administration engineering design services for the project. HVAC design included replacing twenty one hot water/chilled water air handlers with 1) new hot water/chilled water air handlers and 2) replace hot water/chilled water handlers with VAV units with … Read More